Skip to content
VISTAby IP
07 · Hotels

Refurbish hotel surfaces with a plan by room and zone

We supply and install suitable film on selected doors, panels, furniture and glass, after a survey and an approved sample.

Written for

General manager / hotel director

The director proposes the refurbishment; the owner approves the budget and the technical lead checks feasibility.

When this usually starts

Planned refreshing, worn surfaces, or complaints about specific rooms.

"It is not enough that the room looks good; I need to know when I can sell it again."

General manager / hotel director
Discuss a trial room
Hotel door refinished with architectural film

A real hotel door or reception with a before and after detail; no photo that implies a project of ours that does not exist.

The specific problem and the services that fit it.

No agreed period, no trial element, and no costing for the whole refurbishment process.

Juggling bookings, housekeeping, maintenance, and taking rooms out of service.

The work affecting the guest stay, or the refinished surfaces looking cheap close up.

An approved trial room, a predictable sequence, and the space back in service after acceptance.

What we lead with
  • Decorative film for doors, furniture and lifts
  • Frosting
  • Solar control
  • Suitable anti-slip tape
What we show you first

A real trial element, a close-up of the edges, the schedule, and the conditions for putting the room back into service.

How the material, scope and schedule get decided

A sample on the actual substrate, an edge detail, cleaning instructions, and a room-by-room schedule.

Promising a lead time without a survey

Promising a lead time without a survey, messy work areas, and pushing coordination onto reception.

What you actually get

Discretion, punctuality, clean work, and an understanding of hotel operations.

This is the evidence this page is designed to carry. Add the real photographs before the page goes to a customer.

The two questions we get asked

Can this be done without closing the whole hotel?

It is planned by zone; the specific limitation depends on the site and the work.

How long does the covering last?

The lifetime and the warranty are settled for the chosen product, substrate, load and maintenance.

What to send us

Discuss a trial room

  1. 01Photos
  2. 02Number of comparable rooms
  3. 03Free periods
  4. 04Desired result

A contact for the reply; the phone number can be optional.

How this page is built
  1. 1

    Headline and a photograph of that kind of site.

  2. 2

    The specific problem and the services that fit it.

  3. 3

    A comparable real detail or a sample.

  4. 4

    How the material, the scope and the schedule get decided.

  5. 5

    The objections and the short form.